src/pages
Top doc: guides/claude-code.md
24 analysis runs collected. The feedback window is still building; 6 more reviewer signals before public performance claims.
Building
24
4/10
Building
Building
24/20
The run window is complete, but public performance metrics are still withheld until enough reviewer feedback has accumulated. Need 6 more feedback events before the public proof has enough statistical weight.
Public proof metrics stay hidden until both the run window and reviewer-feedback minimum are complete.
Top doc: guides/claude-code.md